答案和详解如下: Q56 C Study Session I6-72-f The total estimated price change for the bond is composed of the estimation based on the convexity. An option-free bond will exhibit positive convexity (gains will be greater than losses given a change in yields) making the reduction price less than that implied by duration alone. |