- UID
- 222297
- 帖子
- 431
- 主题
- 13
- 注册时间
- 2011-7-2
- 最后登录
- 2016-1-9
|
What am I missing - equity risk premium
this is driving me nuts
pg346 CFAI equity book (question is on pg 348, number 19)
Current level of S&P500 is 1200
Current div on the S&P500 is 30
Long term US gov bond yield is 4.75
Future earnings growth rate of the S&P500 is 6.75
The gordon growth model estimate of equity risk premium is closest to:
the answer is 4.67%
R=D1/E0 + G
I get the D1/E0 part, but not G
The have G as = .0675-.0475. Why? What am I missing? |
|