返回列表 发帖

Schewser Question on Point Estimate

In Schewser Qbank there is one question on point estimate but I am not able to understand the solution for it, Please help me out
An airline was concerned about passengers arriving too late at the airport to allow for the additional security measures. The airline collected survey data from 1,000 passengers on their time from arrival at the airport to reaching the boarding gate. The sample mean was 1 hour and 20 minutes, with a sample standard deviation of 30 minutes. Based on this sample, how long prior to a flight should a passenger arrive at the airport to
have a 95% probability of making it to the gate on time?
A) Two hours, thirty minutes.
B) Two hours, ten minutes.
C) One hour, fifty minutes.
The correct answer was B) Two hours, ten minutes.
We can use standard distribution tables because the sample is so large.
From a table of area under a normally distributed curve, the z value corresponding to a 95%, onetail test is: 1.65. (We use a onetailed test because we are not concerned with passengers arriving too early, only arriving too late.)
Here, we do not divide by the standard error, because we are interested in a point estimate of making our flight.
The answer is one hour, twenty minutes + 1.65(30 minutes) = 2 hours, 10 minutes.
If it is saying that we need to calculate point estimate then for mean point estimate should be same isnt it?
Please explain me………..

because you are not asked to estimate the accuracy of the MEAN. In this case, the point estimate (sample mean) is virtually true mean because of the sample size. More technically, standard error = s/square (1000) ~0. Remember standard error is used for estimating the accuracy of point estimate as a representative of the true mean.
You are asked to estimate the minimum value to where 95% of population will exceed. As I said earlier, you can assume that the sample distribution represents true population and continue from there, since you are asked to
Hope it clarifies.

TOP

that is correct but why it is not taking standard error into picture, why it is just adding z value multiply by standard deviation ( and not standard error) to mean…….

TOP

返回列表