- UID
- 223280
- 帖子
- 242
- 主题
- 99
- 注册时间
- 2011-7-11
- 最后登录
- 2013-8-23
|
6#
发表于 2011-7-11 20:09
| 只看该作者
If it's independent = choose both projects as long as NPV >0 and IRR > discount rate (usually WACC)
If it's mutual = choose the project with the highest IRR and NPV so long as IRR > WACC and NPV > 0, but if the rank conflicting, use NPV instead because it calculates the net increase in the company value. |
|