上一主题:2008 CFA Level 1 - Sample 样题(1)-Q51
下一主题:2008 CFA Level 1 - Sample 样题(1)-Q56
返回列表 发帖

2008 CFA Level 1 - Sample 样题(1)-Q53

53Holding all other factors constant, an increase in expected yield volatility will cause the price of a(n):

A. putable bond to increase.

B. callable bond to increase.

C. embedded put option to decrease.

D. embedded call option to decrease.

      

[此贴子已经被作者于2008-11-7 15:14:40编辑过]

答案和详解回复可见:

Correct answer = A

"Risks Associated with Investing in Bonds," Frank J. Fabozzi
2008 Modular Level I, Vol. 5, p. 284
Study Session 15-63-n
explain how yield volatility affects the price of a bond with an embedded option and how changes in volatility affect the value of a callable bond and a putable bond
Increasing yield volatility increases the value of both put options and call options, which increases the value of a putable bond but decreases the value of a callable bond. 

 

TOP

vb ,ytm ytm

TOP

t

TOP

thanks

TOP

谢谢哦!

TOP

thanks!

thanks!

TOP

a

TOP

a

TOP

a

TOP

返回列表
上一主题:2008 CFA Level 1 - Sample 样题(1)-Q51
下一主题:2008 CFA Level 1 - Sample 样题(1)-Q56