上一主题:[ 2009 FRM Sample Exam ] Operational and Integrated risk management Q12
下一主题:[ 2009 FRM Sample Exam ] Market risk measurement and management Q7
返回列表 发帖
 

46、A portfolio manager is constructing a portfolio of stocks and corporate bonds. The portfolio manager has estimated that stocks and corporate bond returns have daily standard deviations of 1.8% and 1.1%, respectively, and estimates a correlation coefficient of returns of 0.43. If the portfolio manager plans to allocate 35% of the portfolio to corporate bonds and the rest to stocks, what is the daily portfolio VAR (2.5%) on a percentage basis?


A) 2.71%.


B) 3.05%.


C) 2.27%.


D) 2.57%.

TOP

 

The correct answer is A


First, calculate the daily percentage VAR for stocks and corporate bonds:



Stocks: VAR(2.5%)Percentage basis = z2.5% × σ = 1.96(0.018) = 0.0353 = 3.53%


Bonds: VAR(2.5%)Percentage basis = z2.5% × σ = 1.96(0.011) = 0.0216 = 2.16%


Next calculate the portfolio VAR using weights of 35% for bonds and 65% for stocks:



[0.652(0.03532) + 0.352(0.02162) + 2(0.35)(0.65)(0.0353)(0.0216)(0.43)]0.5 = 0.0271 = 2.71%


TOP

 

47、An insurance company currently has a security portfolio with a market value of $243 million. The daily returns on the company’s portfolio are normally distributed with a standard deviation of 1.4%. Using the table below, determine which of the following statements are TRUE.

< >>

zcritical

Alpha

One-tailed

Two-tailed

10%

1.28

1.65

2%

2.06

2.32

  1. One-day VAR(1%) for the portfolio on a percentage basis is equal to 3.25%.
  2. One-day VAR(10%) for the portfolio on a dollar basis is equal to $5.61 million.
  3. One-day VAR(6%) > one-day VAR(10%).

 A) II and III only.


B) I and III only.


C) I only.


D) I, II, and III.

TOP

 

The correct answer is B


To find the appropriate zcritical value for the VAR(1%), use the two-tailed value from the table correspondnig to an alpha level of 2%. Under a two-tailed test, half the alpha probability lies in the left tail and half in the right tail. Thus the zcritical 2.32 is appropriate for VAR(1%). For VAR(10%), the table gives the one-tail zcritical value of 1.28. Calculate the percent and dollar VAR measures as follows:


VAR(1%)

 = z1% × σ

 = 2.32 × 0.014

 = 0.03248 ≈ 3.25%


VAR(10%)

 = z10% × σ × portfolio value

 = 1.28 × 0.014 × $243 million

 = $4.35 million


Thus, Statement I is correct and Statement II is incorrect. For Statement III, recall that as the probability in the lower tail decreases (i.e., from 10% to 6%), the VAR measure increases. Thus, Statement III is correct.


5.jpg (20.36 KB)

5.jpg

1.jpg (1.68 KB)

1.jpg

TOP

怎么这么多广告……= =

TOP

返回列表
上一主题:[ 2009 FRM Sample Exam ] Operational and Integrated risk management Q12
下一主题:[ 2009 FRM Sample Exam ] Market risk measurement and management Q7