- UID
- 223243
- 帖子
- 238
- 主题
- 153
- 注册时间
- 2011-7-11
- 最后登录
- 2013-8-11
|
TI BAII Calculator problem on NPV
I encountered a problem on calculating NPV using the TI BAII calculator. I followed the Schweser book (and the calculator instruction) and I was able to input the initial cash outlay and period 1 cash flow. When I use the arrow to input the period 2 cash flow it won’t allow me to do so (I am supposed to see “CF2=”, instead, I kept getting “CF0=”. I saw “INS” in the display box, not sure if I am supposed to see this. Of course, I cleared all previous work or formula. This is driving me crazy! Did anyone encountered this problem before? HELP!!!!!!!!!!!!!! |
|