
- UID
- 223208
- 帖子
- 190
- 主题
- 162
- 注册时间
- 2011-7-11
- 最后登录
- 2013-9-22
|
Hopefully this is a simple question - but I feel like I keep running into problems when either valuing a bond or doing arbitrage where sometimes the spot rate given needs to be divided by 2 and sometimes it needs to be left alone for discounting.
Does it have to do with the BEY? Or should the spot rate always be divided by 2 in all cases?
Thanks. |
|